Recent projects
Check out our latest work.
Project: School Network Installations in Berlin – Spandau District
We carried out comprehensive structured cabling and power installations across several educational facilities in the Spandau district of Berlin.
Scope of work:
Each installation was completed with full documentation and certification protocols. Our focus was on delivering a stable, certified infrastructure ready for intensive daily use in educational environments.

Project: Oberhavel Kliniken – Oranienburg

We participated in the modernization of the network and electrical infrastructure at the Oberhavel Kliniken hospital in Oranienburg, where the building was being extended with new wings while remaining fully operational.
Our tasks included:
Working in a live hospital environment required precise coordination, attention to safety, and minimizing any disruption to the medical facility.

Project: Electrical Installations –
Residential & Hotel Complex, Heide Str., Berlin

We completed a full-scale electrical installation project in a new residential and hotel complex located on Heide Str. in Berlin.
Scope of work:
All installations were carried out according to the latest safety and quality standards, ensuring long-term reliability and seamless integration with smart building infrastructure.
Project: Gasometer Schöneberg – Berlin

At the iconic Gasometer Schöneberg site in Berlin – a former gas storage facility turned modern building – we carried out comprehensive installation works within its uniquely cylindrical steel structure.
Scope of work:
The work combined technical complexity with the architectural challenge of operating inside a historic, round structure. Precision, adaptability, and coordination with other trades were key to delivering quality results in such a unique environment.
Project: Märkische Allee Residential Tower – Berlin-Marzahn
Our tasks included:
The project was carried out in a 20-storey residential building located on Märkische Allee in Berlin-Marzahn. Due to the scale and height of the structure, precise coordination and safe routing of vertical cabling were crucial for the successful completion of the project.

